| Ordered pipes, and called Miss Utility to mark underground utilities |
![]() |
| We had to remove some tree branches to make room for the drill rig |
![]() |
| Chipper eats pine tree branches |
![]() |
| Drill rig is ready |
![]() |
| A few more branches will be trimmed |
![]() |
| Drainage ditch and water containment pool |
![]() |
| The start of drilling for the 1st hole, we hit rock at 30 feet |
![]() |
| Pushing geothermal pipes down the hole |
![]() |
| Adding grout |
![]() |
| Filling grout into the grouting machine |
![]() |
| The type of grout used CLICK for more information |
![]() |
| Hole number 1 was completed at the end of the first day |
![]() |
| The next day hole 2, we hit water at 70 feet with 30 GPM rate |
![]() |
| Measuring the containment pool |
![]() |
| Pump truck removes the water |
![]() |
| Grouting hole number 2 |
![]() |
| After drainage, filling up the containment hole and trench |
![]() |
| Both holes are completed at day 2, waiting on trench to the house |
![]() |
| Foster Well & Pump Company CLICK for more information |
![]() |
| Trench open and geothermal pipes are being tied in to the header |
![]() |
| Trench is about 30 feet long |
![]() |
| Pipes will connect and enter the house under the foundation |
![]() |
| Some Dow Blue Board covers the wells for good measure and trench is covered |
![]() |
| Outside Loop Installation is Finished!! |